Taylor Millard
Nov 4th, 2001, 03:13:03 AM
Three Dreadnaughts and 2 Squadrons of TIE Devils.
Someone will have to help me with these specs.
Three Dreadnaughts at 600 meters each. Takes 15 days for two of them.
Will be finished on November 18th at 2:06AM.
The third will be finished on November 30th at 2:07AM
The fighters will be ready on November 7th at 2:08AM? Two squardrons of 12. 24 fighters total.
*Using Shipyard 3.
OOC: Can someone confirm this for me? The fighters I mean. Thanks.
Someone will have to help me with these specs.
Three Dreadnaughts at 600 meters each. Takes 15 days for two of them.
Will be finished on November 18th at 2:06AM.
The third will be finished on November 30th at 2:07AM
The fighters will be ready on November 7th at 2:08AM? Two squardrons of 12. 24 fighters total.
*Using Shipyard 3.
OOC: Can someone confirm this for me? The fighters I mean. Thanks.